




THOR THR-LPG-45-P





Diversen DOGAN YILDIZ LPG 45 M3 LPG-BUTANE
14 500EUR
Precio sin IVA
- ≈ 288 612 MXN
- ≈ 16 559 USD





Diversen ISISAN 45M3 LPG-BUTANE
10 000EUR
Precio sin IVA
- ≈ 199 043 MXN
- ≈ 11 420 USD





Diversen Isisan 45M3 LPG-BUTANE
10 000EUR
Precio sin IVA
- ≈ 199 043 MXN
- ≈ 11 420 USD
Semirremolque cisterna nuevo para transporte de gas THOR THR-LPG-45-P
Ver similares
Tenemos otros anuncios similares a esta oferta
Ver lo que hay en stock ahora
El vendedor no indicó el precio
Este anuncio se conserva en el archivo como referencia (especificaciones, precio habitual). En el sitio no hay anuncios desactualizados — todas las opciones activas se encuentran a continuación.
Brand : THOR TRAILER
Chassis : Half chassis made of 6252 Steel quality . Strong and Heavy Duty type.
Axles : 3 x Turkish Axles , German Tüv Approved with 14 tons capacity each.
Brakes : Drum Brakes
Suspension : Steel Suspension
Brake System : Two line brake system with WABCO ABS according to European Norms,
Automatic Slack Adjusters
Landing Legs : 24 tons each according to the European Norms
Kingpin : 2 ‘’ changeable to 3,5 ‘’ according European Standards. King Pin Plate thickness 12 mm
Tyres : 12 + 1 385/R22.5 Bridgestone with Steel Rims
Electrical System : 24 V according to European Norms. ( ADR stop lights, 5 Lights on each side )
Complete Reflectors and Signs 3M Brand , Wheel chocks, 2 x Fire Extuinguisher ADR , 2 Units Food Box, Sunshade on the Tank
Accessoires : Water Tank , Spare wheel carrier
Tank Specifications :
Project Code : AD2000 Code-PED97/23/EC
Design Temperature : Min -20 C / max. +50 C
Design Pressure : 17,16 bar
Test Pressure : 26,50 bar
Tank Material : P355 GH
Head Type : Elipsoidal
External Tank Diameter : 2.400 mm
Wall Thickness : 10 mm
Total Length of Tank : 13.200 mm
Equipments on Tank :
-2 inch Safety Relief Valve : REGO 7534G ( 2 Units )
-Rotogauge – Rotary Level Indicator ) : REGO ( 1 Unit )
-¾ inch excess Flow Valve for Manometer ( 1 Unit )
-Thermometer (-30/60 C ) : Pakkens ( 1 Unit)
-Manometer ( 0-25 bar ) : Pakkens ( 1 Unit )
-Hydraulic Operator ( 1 Unit )
-2 inch Hydraulic Valve ( 2 Units )
-3 inch Hydraulic Valve ( 1 Unit )
-2 inch Ball Valves : Batu ( 3 Units )
-2 inch Filler Flanges : M60x4 ( 3 Units )
-ACME Filler Cap : ( 3 Units )
-Filter : Batu ( 1 Unit )
-16 inch Manhole ( 1 Set )
-Earthing Bar : ( 1 Set )
Paintwork and Sandblasting :
-During painting works of the external tank surface , it will be cleaned properly from any burr, hollow ,oil and dirt.
-Following the cleaning works, sanding will be applied to obtain surface appearance of SA 2 ½ quality.
-Roughness Value of the Surface will be 50 – 70 Rz
-As First coat will be applied epoxy paint base with surface tolerance and dry film thickness of 180 micron
-As the second coat , arcylic polyurethane top layer with high resistance with a dry film thickness of 70 micron
-Final Coat color of the Tank will be white ( RAL 9010 )
-Total Paint Thickness will be 250 microns
Radiographic Tests :
-Welding Seams of the tank will be subject to radiographic control by 100 % longtidunal values .
-Radiographic images will comply with the EN 1435 standard.
-The Relevant staff will be certified according to EN473.
-Radiographic examinations will be made through high-sensitive , panoramic and linear X-Ray devices.
-These controls will be executed by certified staff
Penetration Test or Magnetic Particle Test :
-Nozzle _Body and Manhole – Body Welds will be controlled through penetration or magnetic particle testmethod by 100%
Hydrostatic Test :
-Following the construction , the tanks will be subject to hydrostatic test as per the design rules and standards.
-During hydrostatic Test , clean and fresh water will be used.No Liquid which may react to the tank materials will be usedfor hydrostatic test.
-In case the water and ambient temperature is below 15 C, the hydrostatic test will be not performed
-The Hydrostatic test will be accompanied by the independent certification body TURK LYOD .
-Following the hydrostatic test, inside and all internal Pipes of the Tank will be dehydrated.
-Inside of the Gas will be purged with gaseous nitrogen.
Certification :
-The tank will hold a branding / ‘’ Inspection Report and Certificate’’ issued by an international independent auditcompany ( Turk Lyod ) according to the European directive.
-Quality Plan and F Module Certificate
-Inspection Report and Certificate
-Quality Plan
-Sheet Orientation , Material List, Material Certificates
-Material Orientation Plan
-Material List
-Sheet , pipe and flange certificates
-Certificates of the welding materials
-Welding Method Instructions ( WPS )
-Welding Method Tests ( PQR )
-Welder Certificates and Welding Plan
-Plain seaming of the Body Sheet ( WPS )
-Circumferrential welds of the Body ( WPS )
-Nozzle – Body – Manhole Weldings ( WPS)
-Pipe – Pipe,Pipe-Flange Weldings ( WPS )
-PQR
-Welder certificates
-Welding plan
-Dished Heads Reports, Head Treatment Graph and Report
-Dished Heads control report
-Dished Heads magnetic test report
-Heat treatment graph and report
-Welding Test reports of the Construction
-Longitudanl welding seams
-Circumferential welding seams
-Non-destructive test reports
-Eye and measure control report
-Dye penetrant test reports
-Radiography reports
-Hydrostatic Test Report
-Name Plate , Fixture Certificates
-Carbon copy of name plate
-Carbon Copy of the 3 rd party embossed stamp
Baffles :
-Tank will have three Units of Anti-Slosh baffles
Esta oferta es únicamente informativa. Por favor, confirme los detalles directamente con el vendedor.
El vendedor no indicó el precio
Esta oferta es únicamente informativa. Por favor, confirme los detalles directamente con el vendedor.







